- Contact Person : Mr. Zeng Jack
- Company Name : Taizhou Huimei Electrical Industry & Trade Co., Ltd.
- Tel : 86-576-88600022
- Fax : 86-576-88893322
- Address : Zhejiang,Taizhou,No.100 Taihe Road Taihe Industry Zone JiaoJiang City
- Country/Region : China
- Zip : 318050
Related Product Searches:pressure switch for water pump,High Quality,pressure switch, high pressure level switch,PS06
Feature:
Rated voltage: 220V-240V 110V-120V Frequency: 50/60Hz Max.current: 10A Starting pressure set:1.2 bar, 1.5bar, 2.2bar
Max. working pressure:10bar
Connection Thread: R1"
Protecting Rating: Ip65
Max.working temperature:60C
Woiring requirement: Calbe Diameter 7.5-9mm
------------------------------------------------------------------------------------------------
The highest range of working pressure | Safety proof pressure | ||||||
145PSI(1MPa)--400PSI(2.75MPa) | 600PSI(4.1MPa) | ||||||
>400PSI(2.75MPa) | 800PSI(5.5MPa) |
Three to choose:
Single-Phase | Single-Phase | Single-Phase |
115V AV | 230V AV | 230V AV |
1.5HP 20A | 2.0HP 12A | 3.0HP 17A |
------------------------------------------------------------------------------------------------
Function:
1. Pressure Switch can Start and stop the pump automatically
2. Protect the pump from damage caused by dry-running
3. Examine the water automatically
------------------------------------------------------------------------------------------------
State Led:
1. Red led (state one) light up: The unit is off
2. Green Led (state two) light up: the pump stop
3. Red Led( state one) and green Led( state two) flash alternately in slow speed:pump in operation
4. Red Led (state one) and green led (state two) flash alternately in high speed: pumb stops:waiting to start
5. Press the ON/OFF button for one second to start the unit: press the ON/OFF button for five seconds to stop the unit
------------------------------------------------------------------------------------------------
Decripiton for the exam process:
While the pump is in the absence of the water, it will start the first exam after 3 minis, it will last 50 seconds, then the unit will examine in the following second to twelfth time in every 30 minis, and exam time will last 50 seconds, and the unit will examine in the following thirteenth to forty-seventh time in every 60 mins, exam tim will last 50 seconds, the unit will stop in the forty-eighth exam, During the exam process, it lasts 41 hours.
professional pressure switch is suitable for you
------------------------------------------------------------------------------------------------
pressure switch for water pump